The earth pit loads only a single tenth in correlation with a huge 30 kg for our FRP earth pit chamber. High burden bearing limit and safe working load of more than 5,000 kgs are some features that are better than that of the conventional solid pit. Once introduced, the top of our FRP earth pit chamber can be bolted to forestall altering the earth cathode. Once bolted, the structure prevents the trash to be get stuck between the surrounding and the top.
![]() |
TRIMURTI EARTHING SOLUTION
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |